Walk through a sewing unit and count the bundles waiting at each table. Nobody pays a bill for them, so they feel free. They are not: every bundle is cloth already bought, and the pile decides two things a costing sheet never shows — how long an order really takes, and how many garments carry a mistake before anyone sees it.

What work in progress is

Work in progress (WIP) is every garment that has been started and not yet finished: cut bundles waiting for the line, bundles waiting between one operation and the next, garments waiting for finishing and packing. The more of it there is, the longer a garment spends in the unit.

The one sum Days in the unit = garments in progress ÷ garments finished a day.

A worked example

These figures are made up to show the sum. They are not a benchmark and not a claim about any unit. The line is the one in the line efficiency article: it finishes 260 garments a day. The cloth in each garment is the ₹229.50 from the fabric consumption article. The 12% a year is an assumption, the same sum as in the payment terms article.

Compare a unit that keeps 260 garments in progress with one that keeps 780:

  • Days in the unit: 260 ÷ 260 = 1 day, against 780 ÷ 260 = 3 days.
  • Cloth waiting: 260 × ₹229.50 = ₹59,670, against 780 × ₹229.50 = ₹1,79,010.
  • Interest on that cloth: ₹59,670 × 12% ÷ 365 = ₹19.62 a day, against ₹58.85 a day.

The difference is ₹39.24 a day, about ₹1,177 a month. It is real and it is small. If this were the whole story, nobody would bother with the pile.

Where the pile really costs

Suppose an operator sews the wrong size label on, and nobody sees it until the garments reach the final check. Everything made after the mistake started, and before the first wrong garment reaches the check, carries it. That is the garments in progress.

  • With 260 in progress: 260 garments to put right.
  • With 780 in progress: 780 garments to put right.

If putting one right takes 6 minutes at the ₹6.67 a minute used in the rejects and rework article, that is ₹40 a garment: ₹10,400 against ₹31,200. The big pile costs ₹20,800 more for one mistake — about eighteen times the extra interest of a whole month.

What to do with it

  • Count the pile once a day. Garments in progress, from cutting to packing. Divide by the day's output and write the number of days down.
  • Check the first piece, and check early. A checker near the start of the line finds a mistake with a few garments behind it, not hundreds.
  • Watch where it gathers. A pile in front of one table is the slowest step, as in the line balancing article. Moving the pile does nothing; moving people to that table does.
  • Release cut bundles to match the line, not the cutting table. Cloth that is cut but not sewn is still stock, and it cannot be changed for another style.

What the sums leave out

  • Made-up numbers. The output, cloth cost and 12% are assumptions. Use your own, and count your own pile.
  • Only the cloth is counted. A bundle that has been sewn partly carries wages as well, so the real value waiting is higher than ₹229.50 a garment.
  • Floor space and handling. Bundles take room and are carried, and lost or mixed up. None of that is counted here.
  • Some pile is needed. A line with no bundles between tables stops whenever one operator is slow. The aim is a small pile that is kept steady, not none.

Work out your line's daily output in the production efficiency calculator, then divide the garments you can count in the unit by it. That number of days is the one to bring down.