Finishing and Pressing Cost per Garment

A white iron with its cord coiled beside it lying on a neatly folded pale-blue shirt, with a glass spray bottle and a wooden clothes brush on an olive-green background

Finishing is the last step, so it is counted last and checked least. The costing example in an earlier article has one line for finishing, pressing and packing: ₹25. This is how to build such a number for your own unit, and how to see when one presser is not enough.

Three things pay for finishing

  • The minutes of the people who trim the threads, check and press.
  • The power for the iron or the steam.
  • The efficiency of the person, because a day is not all pressing.

A worked example

These figures are made up to show the sum. They are not a benchmark and not a claim about any garment or any unit. The wage is ₹3,200 a day for 8 hours, which is ₹6.67 a minute, as in the rejects article. The iron draws an assumed 3 kilowatts all day, which is 24 units at the ₹9 a unit of the electricity article, ₹216. Pressing takes 1.5 minutes a garment, trimming and the final check another 1.5, and a person works at 80% of the standard.

  • Pressing: 480 ÷ 1.5 × 0.8 = 256 garments a day for ₹3,200 + ₹216 = ₹3,416. That is ₹13.34 a garment.
  • Trimming and checking: 1.5 × ₹6.67 ÷ 0.8 = ₹12.50 a garment.
  • Together: ₹25.84 a garment. The polybag and the carton are not in it; they are in the packing article.

When one presser is not enough

The line in the cut-and-make rate article makes 260 garments a day. One presser does 256, so four garments are left over every day. The way to find it early is to divide: 260 ÷ 256 = 1.02 pressers. The four garments are 7.5 minutes of overtime for the presser, or a pile at the end of the week.

On a day when the line runs at its standard and makes 320 garments, the sum is 320 ÷ 256 = 1.25 pressers. A second person for the extra 64 garments costs ₹3,416 ÷ 64 = ₹53.38 each, unless they can trim and check as well. The garments are not shipped when they are sewn but when they are pressed, so the finishing step is part of how fast an order leaves, as the work in progress article showed.

Match the finishing to the line Add up the minutes of finishing and divide by what a person does in a day. If the answer is more than the people you have, the pile is already growing.

What to do with it

  • Time the pressing on your own garments, with a stopwatch, for a few pieces of each style. A shirt and a trouser take different minutes.
  • Divide the line's output by the presser's. Then you know before the pile does.
  • Press once. Pieces pressed again are paid for twice; the rejects article puts rework in rupees.
  • Balance it like any step. The line balancing article applies to the end of the line as much as to the middle.

What the sums leave out

  • Made-up numbers. The minutes, the 80% and the 3 kilowatts are assumptions.
  • The equipment. The iron or boiler, its fuel or water, and its upkeep are not counted.
  • Different fabrics. Some cloth needs more care, and more minutes.
  • Rework after packing. A garment crushed in the carton is pressed again.

Put your own people, hours and output into the production efficiency calculator to see what the line makes in a day, then check that the finishing can keep up with it.